Inete Pty Ltd
  • Company
    • Mission Statement
    • Awards
    • Partnerships / Memberships
    • Papers
    • Our Staff
  • Services
    • Project Management
    • Electrical Design
    • Asset Management
    • Control & Automation
    • Commissioning
    • Training
  • Projects
    • Water Management & Infrastructure
    • Power Distribution
    • Mining
    • Coal Seam Gas
  • Contact Us
  • |
  • Company
    • Mission Statement
    • Awards
    • Partnerships / Memberships
    • Papers
    • Our Staff
  • Services
    • Project Management
    • Electrical Design
    • Asset Management
    • Control & Automation
    • Commissioning
    • Training
  • Projects
    • Water Management & Infrastructure
    • Power Distribution
    • Mining
    • Coal Seam Gas
  • Contact Us
  • |
HomeProjectsMining

Mining

BMACO Blackwater Mine Dragline Electrical Re- Design and Re-Location Project

In 2007 Inete was awarded the Engineers Australia Queensland Division Small Business Ventures/Projects award for its work carried out on DRE41.
Dragline Forty-One (DRE41) is an 8200 Marion dragline that was relocated from the USA for use at the BMACO Blackwater Mine, open cut pit, near the township of Blackwater in Central Queensland.
CASE STUDY

BMA Peak Downs Mine Dragline Site Build

Inete was engaged directly by BMA to provide Electrical Principal Representation for the project and to work with them and the other contractors involved to ensure the best possible outcome for the project.
CASE STUDY

BMA Goonyella Riverside Reagent System Commissioning

Inete was engaged directly by BMA as the Commissioning Manager for the project to work with
them and the other contractors involved with the commissioning to ensure the best possible
outcome for the installation and operation of the new systems.
CASE STUDY

BMA Caval Ridge Dragline Major Shutdown

Dragline 17 is a Marion 8050 dragline, modified for UDD (Universal Dig Dump) operation, currently in use at BMA’s Caval Ridge Mine. In late 2014 the dragline was walked across from the neighbouring Peak Downs Mine. The dragline was electrically and mechanically overhauled during a sixteen week major shutdown. The purpose of the major shutdown was to effectively reset the working life of the machine.
CASE STUDY