BMA Water Pipelines Pump Station HV Protection and Earth Studies
Inete was engaged to carry out a high voltage protection study to determine the protectionsettings required for the existing and new equipment. In conjunction with this Inete was also
engaged to carry out an Earth study to determine step and touch potential limits and to design
the new earth grid system for the site.

BMA Goonyella Riverside Village Electrical Compliance
Inete was engaged to do an audit of the village operation against the electrical requirements of the Qld Coal Mining Safety and Health Act 1999.As a result Inete was further engaged to manage the close out of any work required to gain full compliance with the Act.