Dragline Forty-Two (DRE42) is a new large Bucyrus 8750 DC machine that is being constructed at the BMA Peak Downs Mine open cut pit near the township of Moranbah in Central Queensland. It is the first machine of its kind to be purchased by BMA and the second machine of its size. Planned walk off of the machine is December
Dragline Forty-One (DRE41) is a large 8200 Marion machine that was relocated from the U.S.A. for use at the BMACO Blackwater Mine open cut pit near the township of Blackwater in Central Queensland . It is the second machine of its size to be introduced to the Blackwater pits. This is the second time this machine had been relocated. Originally
Inete Pty Ltd is provided the Commissioning Managers role for the upgrade of the Train Loadout at the BMACO Goonyella Riverside Mine in Central Queensland.
Inete Pty Ltd has successfully completed the commissioning engineers role at the BMACO Goonyella Riverside Mine in Central Queensland. This project involved Inete producing and implementing the commissioning process as well as providing the electrical expertise on-site for the job.
Dragline Seven (DRE007) is situated in the Bowen Basin at the BMACO’s Peak Downs mine in Central Queensland, 30km South of the Moranbah Township. DRE7 is a Bucyris 1370 dragline that was first put into service in 1972. The machine is currently undergoing its major shutdown which occur every fifth year. Inete is currently providing the control systems expertise which
Dragline Twenty-Three (DRE23) is situated in the Bowen Basin at the BMACO’s Peak Downs mine in Central Queensland, 30km South of the Moranbah Township. DRE23 is a Bucyris 1370 that was converted to the Universal Dig and Dump(UDD) system in 2002. In June-July 2007 Inete was involved in the machines five year major shutdown. Inete provided the control systems expertise
Dragline Thirty-Nine (DRE39) is a Bucyris 1370 Dragline situated in Blackwater in Central Queensland. Inete was contracted to be involved in the Boom-Replacement Shutdown which run for two weeks in August 2007. Inete was engaged by BMACO to upgrade and implement a new Programmable Logic Controller (PLC) on board the machine, as well as providing the services to Raise/Lower the
Inete Pty Ltd is provided the Commissioning Managers role for the relocation of the Maingate conveyor at the BMACO Crinum East Mine in Central Queensland.